top of page

 

Westwood

  Commissioning

    Services Ltd.

HVAC Commissioning Engineers. Air balancing. Water balancing. DHWS testing . HTM 03-01 Annual Verification (AP). Validation. Troubleshooting. Ultrasonic flowrates. Pre-strip out surveys. Seasonal Commissioning. Witness testing. (CIBSE, BSRIA, HTM, HBN'S)

OUR SERVICES

Air & Water balancing

Air & water balancing of various systems including VAV, CAV systems.

Heating & chilled water balancing.

DHWS commissioning. 

Test sheets can be issued at stages throughout the commissioning period or a full test pack can be issued promptly at the end of the project. (On smaller projects the sheets / reports will be issued within 24 hours of completing the job).

System Checks & HVAC Surveys

Mechanical HVAC surveys of duct work and pipe work can be marked up on drawings, system reports, seasonal commissioning checks, flow rate checks and system volumes. Witness testing and spot checks of commissioned systems. 

"pre strip out" surveys for consulting engineers to enable validation of system volumes prior to making adjustments.

Operating Theatre Annual Verification

(AP) Authorised person HTM 03-01 for carrying out annual operating theatre verifications and other critical ventilation systems within healthcare premises. In depth photographic reports include UCV velocity testing, full plant checks, air volumes, air change rates, room pressure regimes and other checks to comply with HTM guide lines. 

SERVICES
ABOUT

ABOUT

Westwood commissioning services are based in the Midlands  giving us an ideal location to access the whole of the UK, Between the team we have over 55 years experience in the industry with a vast knowledge of HVAC systems. We are always up to speed with the latest advances in commissioning.

We offer a fantastic friendly service utilising the latest calibrated test equipment.

Our aim is to offer the client a cost effective trouble free hand over period during the commissioning process.

Prices can be arranged on either a total job cost from a survey of the drawings or a "day rate" fee.

WHY COMMISSION

Why Commission ?

The proper commissioning of HVAC systems represents 

one of the quickest and most cost effective opportunities

to increase energy efficiency.

HVAC Heating, ventilation and air conditioning systems typically consume the highest proportion of energy in office buildings, which can be as high as 80% of base building consumption.

Commissioning represents one of the quickest and most cost effective ways to increase energy efficiency because typically 20 to 40% of energy in older buildings is wasted.

Even in a well managed building there is scope to improve energy efficiency by 10% through good commissioning practice. 

 

projects

Projects

AVL Technology Centre - Coventry.

Providing the following services;

Air balancing

Heating & Chilled water balancing

Radiator temperature balancing

Domestic hot & cold water services balancing

New Cross Hospital - Wolverhampton

Providing the following services;

Air balancing

Heating & Chilled water balancing

Radiator temperature balancing

Domestic hot & cold water services balancing

Warwick Hospital.

Providing the following services;

Air balancing

Survey & validation of existing heating & chilled water systems.

CONTACT

Enquiries

For any enquiries, questions or a free quotation please

contact Mark Westwood.

call: 07597 326732

Email: (24 hours) mark@westwoodcommissioningservices.com

Email: (Office 09:00am to 17:00pm) admin@westwoodcommissioningservices.com

Head Office

29 Gorsemoor road 

Heath Hayes

Cannock

Staffordshire

WS12 3HW

 

CONTACT
bottom of page